Frequently Asked Questions
One sod pallet covers approximately 500 Sq. Ft.
One sod pallet usually weighs between 2800-3000 pounds. When completely saturated sod pallets will weigh more. Please keep that in consideration if you choose to pick up from our showroom.
We do guarantee the sod will come fresh from the farm, but there is no guarantee or warranty expressed or implied for the ongoing survival of the sod for conditions beyond our control.
Our trucks can haul up to 18 pallets per truck.
Yes, you can pick up the sod from our showroom located at 3108 Lithia Pinecrest Rd, Valrico, FL 33596.
Yes, we carry a variety of sod plugs and full pieces. You can purchase them from our online store here and they will be delivered to you in 1-2 weeks.
Sod is a plant, it requires at least four hours of sunlight to survive. However, there are some variations of sod that shade tolerant such as St. Augustine: Provista, Bitter Blue, Seville, and our Zoysia grass. If an area is too shady even for weeds to grow we recommend not using sod and utilizing mulch or rocks.
All of our sods will perform well in full sunlight if adequately irrigated, treated, and well maintained.
Yes, sod can be installed while dormant. The establishment period will be longer since the grass is not actively growing, but once the weather warms and with proper maintenance the sod will thrive.
Bahia grass has the lowest maintenance; it grows well with very little water and fertilization. Bahia is the only option for sites with no irrigation. Bahia is pasture grass and grows on its own, however, it can have ants, weeds, and appear brown and hay-like.
Empire Zoysia is another semi-low maintenance grass when compared to St. Augustine. It does however require irrigation and treatment to keep it maintained.
We are committed to delivering sod fresh from the farm. Once you place your online order for sod pallet(s) or piece(s), we will contact you to schedule the delivery date that works for you. We are unable to provide a delivery time, but we can give a window of time that the sod will be delivered. Typically ETA is 24 to 48 hours.
No, we can deliver the sod even if a person is not present at the site of delivery. Please call the office with specific delivery and offloading instructions for our driver. Our forklift may not be able to drop off pallets in a fenced in area or in backyards.
Yes, as long as the forklift can access the areas, the delivery driver can place the pallets where you need them. We primarily will put the pallet(s) on the left or right side of the driveway but for a small fee we will place the pallets as needed.
The best way to do this is to measure the length and width of the area you want to sod, then multiply these numbers together to get the total area. You can also utilize this free tool from Sod Solutions here. If any other assistance is needed please feel free to give our office a call or come down to our showroom, someone is always available to help.
Same day delivery is always available; dependent on our available inventory. We do recommend at least a 24 hour advanced notice
If you are having our sod delivered to you we recommend having your installation area prepped and ready before the sod arrives. We strongly recommend installing the sod within 24 hours of receiving it. If you buy a pallet in the hot summer months do not leave it stacked for longer than 48 hours, it will begin to compost under the extreme weight and heat.
Yes we do! Get a gorgeous new lawn with a 60-day warranty with Sod-X, schedule your estimate here.
Once the job is accepted, a "change order" is required to make any changes at least 48 hours before the work is scheduled to be done. This policy is in place to ensure we have the proper materials for the job. We will complete the work as described in the quote agreed upon, and we have no obligation to carry out any further work. Any addon requests will come at an additional cost.
Sod can be installed all year round in central Florida, but at the beginning of spring or middle of fall would be the best times.
No, you do not have to be home when we are replacing your lawn. As long as we have the authorization to perform the work on your property as stated in the accepted quote.
A roller machine is used in the final stage of the installation process to get rid of any air pockets and to help the roots make contact with the soil.
Estimates are valid for 90 days. Grass regrows and sod prices change. After 90 days you would need to schedule another estimate so we can re-evaluate any changes to the site.
It is possible to get an estimate the same day you request it. Our knowledgeable estimators are available 6 days a week. You can schedule an estimate here or contact us here.
Knowing the square footage is a perfect first step. However, there are several other factors that can determine the materials, tools, and time needed for your specific project. Our estimators look for accessibility for our delivery trucks and loaders this included but is not limited to:
- obstructions
- sandy/saturated soil
- septic tanks
- drain fields
- narrow gates
- high traffic roads
- narrow roads
By evaluating the site, we are able to provide a more accurate estimate.​
No, as long as we have permission to take measurements on the property, we are able to conduct the evaluation. Use marking paint to identify areas that need to be replaced. we will be able to leave the quote at your door or send you an email as requested.
You can schedule an estimate here, and we will contact you to continue that process. Or you can always contact us here to schedule one as well.
If rain chances are above 70% or if the sod fields are saturated from prior rains, sod installations will be pushed back. This is more common during the summer months. We will stay in contact and inform you of any changes or possible delays.
If you are going to be replacing your entire yard, turn off the irrigation. Make sure irrigation is flagged and have your cable company or 811 come mark your cable lines.
We understand delays happen in life and we are flexible. Please notify the office by contacting us here, at least 48 hours before your scheduled replacement.
For pick-up or delivery payment is due upon checkout. As for installations full payment is due upon completion of the job.
We take cash, personal and business checks, Visa, Mastercard, Discover, and American Express.
Water your new sod immediately after installation. Follow the link provided from the University of Florida that explains how to properly water to establish a new lawn:
https://blogs.ifas.ufl.edu/okaloosaco/2016/04/07/properly-water-to-establish-a-lawn/
The best time of day to water your lawn is early morning. Later in the day will result in unnecessary evaporation and late in the evening will cause standing water which can lead to fungus and other diseases.
For the best results set your irrigation system so that the last zone finishes 1 hour prior to sunrise. This will give the water a chance to seep into the soil as needed and any excess will be evaporated during the day reducing the chances of disease or fungus.
During the first month it is not recommended to fertilize or treat your sod unless you have pests, such as grubs, webworms, or a disease, most commonly fungus. After the establishment period we recommend getting a professional lawn treatment service to maintain a healthy yard for years to come. We also recommend a treatment called "Milorganite". This product can be found at any Lowes, Home Depot, Walmart, or Ace.
If you notice your sod is not performing well within the first weeks, please check that your irrigation system is getting complete coverage of your lawn. Take pictures of the problem areas and contact us. We are here to work with you not against you.